Blue Buffalo

Vantage designed, laid out, planned and installed large-scale identification for this operating production facility.

Completed Blue Buffalo exterior signs on two faces of the building
25+ FT
Buffalo mark · width
33+ FT
General Mills “G” · height
130 FT
Tower height
275 TON
Crane capacity
150 FT
Boom lift

The commission

The project had spent more than a year unresolved when Vantage was asked to evaluate a path forward. Reviewing the site and plans revealed issues with scale, access and attachment. Vantage revised the approach, coordinated production and self-performed the installation.

See the installation in motion.

Blue Buffalo building signage, project-video preview
Watch on YouTube ↗

01 / Understanding the site

A large sign. A much larger access problem.

The tower stood 130 feet tall, with a lift path reaching over nearly 225 feet of building. Below it, the production facility needed to keep operating. Access, lifting and plant occupancy had to be planned together.

The scope also needed correction. Vantage checked the requested scale against the earlier layouts, surveyed the building and developed the signage to the approved brand guidelines.

No conventional rear access

Parts of the wall could not be reached from inside. The new signs needed concealed attachments that installers could access from the exterior.

Components too large to ship whole

The irregular sign forms required sectional construction, multiple trailers and careful handling before they could be joined on the wall.

An occupied work zone

Overhead lifts required controlled plant-area evacuations, advance notice and coordination between the installation teams and facility.

Existing HEARTLAND signs with swing-stage access

02 / Planning the work

The lift was a sequence, not a single event.

Vantage worked with JCrane to develop a viable lift plan for the reach to the mill tower. Equipment, fabrication and site activity were coordinated months ahead of installation.

The preliminary sequence considered security check-in, crane and swing-stage setup, existing-sign removal, wall repairs, new-sign placement and contingency time. The construction and attachment of the old signs were variables to resolve in the field.

Explore Project Coordination
3D pre-planning model showing crane position and reach over the Blue Buffalo facility to the east-side sign; not issued for construction
West-side 3D pre-planning model showing crane position and lift reach at the Blue Buffalo facility; not issued for construction

03 / Production & attachment

Built in sections. Connected on the wall.

Vantage designed and laid out the signage, planned the work and performed the installation, with fabrication support from a partner for production beyond its in-house capacity. The signs used reverse-fabricated aluminum construction, quarter-inch aluminum faces and painted aluminum support structures.

Large sections were transported separately and joined during installation. Heavy-duty flip toggles and brackets provided the concealed attachment approach, with drop-in pin connections between sections. This addressed the limited access behind the wall.

Fabrication capabilities and partner support ↗
Blue Buffalo component during partner fabrication
Blue dimensional sign components on a fabrication table

04 / Vantage in the field

High access. Close coordination.

Vantage self-performed installation using a 275-ton crane operated by JCrane, a 150-foot boom lift and swing-stage scaffolding. The large, irregular components needed careful loading and handling, then controlled placement high on the building.

Morning briefings—and new briefings whenever the plan changed—kept the teams aligned. A unified radio system connected the work zone. Facility personnel received advance notice of overhead lifts so affected plant areas could be evacuated while production continued with limited disruption.

Site conditions continued to matter after mobilization. Wall construction differed from the supplied specifications, requiring updated hardware and planning; rain and wind also paused the work.

Explore Installation
Crane and access equipment at the Blue Buffalo facility
General Mills sign installation with swing-stage access

05 / The completed project

Built to be seen.

The completed Blue Buffalo and General Mills identification gives the facility a landmark at the scale of its buildings. Visible from nearby I-70, the signs establish the brand well beyond the immediate site.

Finished Blue Buffalo building identification in Richmond, Indiana
Completed General Mills building mark viewed from ground level
Completed Blue Buffalo identification on the facility, with a buffalo sculpture in the foreground

Project record

The details behind the work.

Location
Richmond, Indiana
Industry
Industrial & Manufacturing
Customer
Blue Buffalo
Project type
Large-scale exterior brand identification
Vantage role
Design, planning, production coordination and self-performed installation
Fabrication partner
Partner fabrication coordinated by Vantage
Crane
Liebherr 1230-5.1 · 275 ton · JCrane, Inc.
Elevated access
Genie SX-150 boom lift · Vandalia Rental; Altrex swing stage · American Scaffolding
Sign construction
Reverse-fabricated aluminum; ¼-inch aluminum faces and painted aluminum support structure
Attachment
Concealed flip toggles and brackets; drop-in pin section connections

The solutions in this project

Explore the signs behind the work.

Plan the scope and investment

Planning a complex signage project?

Let’s talk through the scale, access and coordination your commercial project needs.

Let’s talk through it.

Professional associations & credentials

World Sign Associates
International Sign Association
Midwest Sign Association
Troy Area Chamber of Commerce
Tipp City Chamber of Commerce
Dayton Area Chamber of Commerce
Huber Heights Regional Chamber of Commerce

Project video

If the player does not load, open the video directly on YouTube.

Watch on YouTube